Testing and commissioning records, authority approvals, as-built documentation and O&M manuals — the published third phase of the methodology.
Service 07 of 07
ALDesign Structures provides full-lifecycle oversight of timelines, budgets and quality through to a smooth, fully operational handover, following a published three-stage methodology: pre-construction, construction, then testing and handover.
What this means on site
The published methodology is three phases. Pre-construction: planning, coordination, mobilisation, approvals and scheduling. Construction: civil, structural, MEP and architectural works under continuous quality and safety control. Testing and handover: testing, commissioning, approvals and handover documentation.
Handover is treated as a phase with its own duration and deliverables, not as the day the last trade leaves. That is the difference between a building that is finished and a building that is operational.
Scope
Delivery models: Lump Sum, Design–Build, EPC-light. Interfaces: PMCs, client-direct, joint ventures.
Where it applies
Common questions
What does the handover package include?
Testing and commissioning records, authority approvals, as-built documentation and O&M manuals — the published third phase of the methodology.
Is reporting available to a PMC?
Yes. Project management consultancies are one of the three published interfaces, alongside client-direct and joint ventures.