Service 05 of 07

Architectural Finishing & Fit-Out

ALDesign Structures delivers architectural finishing and fit-out — facades, flooring, ceilings, joinery and specialist finishes — producing ready-to-operate spaces. Fit-out is the company's largest published body of work, with delivered projects including LG, Kuwait Airways, Guardian Egypt and Al Masa Clinic.

What this means on site

How it is delivered.

Fit-out is judged at a distance of 300mm, which makes it the least forgiving package on a site. Setting-out, substrate tolerance and sequencing decide whether a specialist finish reads as precise or as approximate.

It is also the package most often delivered into an occupied or partly-occupied building, where access windows, noise limits and protection of finished areas are as much of the job as the work itself.


Scope

What is included.

  • Facade and cladding installation
  • Flooring, ceilings and partitions
  • Joinery and specialist millwork
  • Painting and applied finishes
  • Sanitaryware and fixed furniture
  • Protection, snagging and clean handover

Delivery models: Lump Sum, Design–Build, EPC-light. Interfaces: PMCs, client-direct, joint ventures.


Common questions

Asked before we start.

What is the largest fit-out delivered?

The Guardian Egypt factory welfare and support facilities, at 17,000 m² in the 10th of Ramadan industrial zone, completed 2024.

Is fit-out delivered inside occupied buildings?

Yes. Several published projects are fit-out within existing operating buildings, including office and branch interiors.

Which named clients are published?

LG, Kuwait Airways, AUJAN Coca-Cola and Guardian Egypt among others. Named brands indicate ALDesign Structures' scope as construction or fit-out contractor, not brand affiliation.

Start a project

Tell us what you need built.

Riyadh and Cairo. From a single fit-out to a full construction package.

Start your enquiry